Schedule

Name the project, build its work breakdown structure (WBS), then add and link activities under the WBS sections.

Open the inspection library OSHA safety library NYC Permit Assistant

Loading schedule…

Build a schedule · Project type and jurisdiction
  1. Set up the project

    Pick the working calendar and confirm the location, jurisdiction, notice to proceed, and required completion dates.

  2. Break down the work

    Organize WBS sections by phase or area. Give each activity a trade, work location, and measurable scope. Estimate hours using quantities, crew production, or experience.

  3. Plan what must happen before work

    Link approved drawings, submittals, material lead times, access, and any issued permits to the first work they release.

  4. Plan safety and inspection hold points

    Review the actual equipment and site hazards with site safety. Check each inspection’s filed scope and assigned inspector. Link visits before, during, or after work and ahead of concealment where applicable.

  5. Check the network and handover

    Connect each work package’s predecessors and successors. Check intentional starts and finishes, critical work, and milestones for substantial completion, testing, sign-offs, and final turnover.

NYC DOB project requirements · OSHA construction safety planning · OSHA residential fall protection

Generate a construction draft

Import a schedule · P6, Microsoft Project or CSV

Choose a Primavera P6 XER, Microsoft Project XML, or CSV export. Preview the WBS, dates, relationships and work requirements before saving into an empty EVA schedule.

CSV columns

ID,Name,Start,Finish,WBS,Duration Hours,Predecessors,Location,Milestone. Enter dates as YYYY-MM-DD and separate WBS levels with >. For multiple predecessors, use SV10:FS+8h;SV20:SS.