Project _example
Schedule
Name the project, build its work breakdown structure (WBS), then add and link activities under the WBS sections.
Open the inspection library OSHA safety library NYC Permit AssistantLoading schedule…
Build a schedule · Project type and jurisdiction
- Set up the project
Pick the working calendar and confirm the location, jurisdiction, notice to proceed, and required completion dates.
- Break down the work
Organize WBS sections by phase or area. Give each activity a trade, work location, and measurable scope. Estimate hours using quantities, crew production, or experience.
- Plan what must happen before work
Link approved drawings, submittals, material lead times, access, and any issued permits to the first work they release.
- Plan safety and inspection hold points
Review the actual equipment and site hazards with site safety. Check each inspection’s filed scope and assigned inspector. Link visits before, during, or after work and ahead of concealment where applicable.
- Check the network and handover
Connect each work package’s predecessors and successors. Check intentional starts and finishes, critical work, and milestones for substantial completion, testing, sign-offs, and final turnover.
NYC DOB project requirements · OSHA construction safety planning · OSHA residential fall protection
Generate a construction draft
| Code | WBS phase | Activity | Start | Finish | Predecessors |
|---|
Import a schedule · P6, Microsoft Project or CSV
Choose a Primavera P6 XER, Microsoft Project XML, or CSV export. Preview the WBS, dates, relationships and work requirements before saving into an empty EVA schedule.
CSV columns
ID,Name,Start,Finish,WBS,Duration Hours,Predecessors,Location,Milestone. Enter dates as YYYY-MM-DD and separate WBS levels with >. For multiple predecessors, use SV10:FS+8h;SV20:SS.
Imported schedule preview
Work requirements preview
Check file scope and submitted technical reports. Inspection timing and permit scope are screening findings from the activity descriptions.
NYC permits to verify before work
Confirm the project jurisdiction and filing with the applicant. The first scheduled activity gives a deadline to check each permit. One approval may cover several activities if the issued scope includes them.
No open activity requirements.
| Activity | Action needed |
|---|
Lead times
Review these estimates before saving the schedule. Add linked steps after importing.
Schedule look-ahead
Preparation due
Activities
Work steps
NYC permits to verify before work
Confirm the project jurisdiction and filing with the applicant. The first scheduled activity gives a deadline to check each permit. One approval may cover several activities if the issued scope includes them.
No open activity requirements.
| Activity | Action needed |
|---|
Lead-time alerts
NYC permit reviews
OSHA safety reviews
Plan project dates
How EVA calculates dates
EVA uses your workweek, shift hours, holidays, company dates and activity links. Each lag day counts as one regular shift. For activities without an estimate, EVA infers the work from their saved dates.
Enter both project dates to see whether the finish can be met. Negative total float flags a missed date limit. Free float shows how much work time is available before an early successor event or the forecast finish moves.
Progress and delays
Record progress through the end of a workday. EVA compares the forecast for remaining work with the saved plan.
Project TR1 and DOB NOW requirements
Record the categories confirmed on the filed report. EVA uses those choices when it reviews activity names and field scope.
| Category | Filed status | Scheduled visits | Activity matches to review |
|---|
Use Add WBS on the project row to start breaking down the work.
| Code | WBS / Activity | Start | Finish | Predecessors | Successors | Actions |
|---|
Relationship flow
0 date conflictsAdd at least two activities to link them.
Each link runs from predecessor to successor. Lag adds a wait, and a negative lag (lead) allows work to overlap. Use Plan project dates to calculate the schedule.
No activity relationships yet.
| Predecessor | Relationship | Successor | Date check | Actions |
|---|
Gantt chart
- Activity
- Milestone
- Critical path
- Date conflict
Calculate and apply project dates to show the critical path.
FS: Finish to start · SS: Start to start · FF: Finish to finish · SF: Start to finish.